澳洲幸运5
热门标签

皇冠体育官网开户:RM1.8 billion allocated for 2022 federal road maintenance

时间:3周前   阅读:3   评论:1

ug环球360www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

Works Minister Fadillah Yusof says the maintenance of federal roads is important to keep them in good condition. – The Malaysian Insight file pic, August 20, 2022.

A SUM of RM1.08 billion has been allocated for maintenance of federal roads throughout the country this year, said Works Minister Fadillah Yusof. 

He said of this amount, RM150 million is for maintenance works in the southern zone covering Pahang, Johor and Negri Sembilan. 

“Maintenance works in Pahang involve an expenditure of RM66.08 million, followed by Johor (RM60.9 million) and Negri Sembilan (RM23.63 million). 

“These maintenance works are important to keep these roads in good condition,” he told reporters in conjunction with the FTRoadpedia South 2.0 Tour in Klang today. 

Fadillah said proposals for road upgrade works on Federal Road FT050 from Ayer Hitam to Kluang in Section 33.8 until the Kluang Stadium junction in Section 49.1 would be submitted to federal authorities next year.

,

皇冠体育官网开户www.hg108.vip)是一个开放皇冠体育官网即时比分、皇冠体育官网开户的平台。皇冠体育官网开户平台(www.hg108.vip)提供最新皇冠体育官网登录,皇冠体育官网APP下载包含新皇冠体育官网代理、会员APP。

,

Fadillah said the Phase 3B project, with an estimated value of RM385.13 million under the 12th Malaysia Plan, is aimed at reducing fatal accidents throughout the alignment. 

He said it is a continuation of the Phase 3A project worth RM219 million, which is under construction and expected to be completed in October 2024. 

“This location has recorded the most accidents in Malaysia due to the absence of road shoulders, medians and U-turns, with 52 accidents reported from 2020 to June 2022. 

“This road is the main toll-free route connecting Batu Pahat, Kluang and Mersing districts, and it will involve construction work on road shoulders, medians, U-turns and related works,” he added.

He also said an additional allocation of RM600,000 has been approved to upgrade streetlights along Federal Road FT050 to improve various aspects of road travel, especially towards the safety of road users. – Bernama, August 20, 2022.


转载说明:本文转载自Sunbet。

上一篇:Firdaus appointed FIABCI Malaysia president

下一篇:环球ug会员开户(www.ugbet.us):UK inflation hits double digits, highest since 1982

网友评论

  • 2022-11-07 00:30:26

    CIMB Group chief executive officer Datuk Abdul Rahman Ahmad said the CIMB ESG-SME Pitch Challenge is part of the group’s flagship The Cooler Earth Sustainability Summit, which plays a dual role as the latest initiative in expanding CIMB’s support for the empowerment of SMEs in the region while encouraging sustainability innovation among ASEAN entrepreneurs.感觉还可以,继续追。